TEFLON INSULATED U-BOLT GUIDE - AG530
- Galvanised carbon steel
- 4 nuts and 4 washers supplied
- Neoprene insulation
- Cork and neoprene base
- 1 mm Teflon bonded to cork and neoprene
- Neoprene insulation is petrochemical resistant


Part Number | Pipe DN | ØD (mm) | C (mm) | M (mm) | K (mm) | L (mm) | Item Weight (Kg) | VariableText | Product | Variation | Add to Quote |
---|---|---|---|---|---|---|---|---|---|---|---|
AG530-114 | 100 | 114 | 157 | M16 | 90 | 180 | 1.33 | 515,888 | 515,889 | ||
AG530-168 | 150 | 168 | 211 | M16 | 90 | 234 | 1.70 | 515,888 | 515,890 | ||
AG530-219 | 200 | 219 | 262 | M16 | 90 | 285 | 2.06 | 515,888 | 515,891 | ||
AG530-273 | 250 | 273 | 316 | M16 | 90 | 339 | 2.43 | 515,888 | 515,892 | ||
AG530-324 | 300 | 324 | 367 | M16 | 90 | 390 | 2.78 | 515,888 | 515,893 | ||
AG530-356 | 350 | 356 | 399 | M16 | 90 | 422 | 3.00 | 515,888 | 515,894 |
Part Number
AG530-114
AG530-168
AG530-219
AG530-273
AG530-324
AG530-356
TESTIMONIALS
To date Anchorage staff have been courteous and knowledgeable while the company itself has proved a reliable partner helping us deliver best possible solutions for some challenging projects.
Mat CarrollRadcoflex Director
I have been in the high-pressure role of ensuring that required items are on site, at the right time, in the right quantity and the team at Anchorage has been invaluable at achieving this task, not to mention all items were completed to a high standard and delivered by if not before the deadlines.
Jordan LeottaMEFT Alliance | Airport Link Project
The beauty of these customized flange mount from Anchorage Group is that they have up to 60 mm in vertical adjustment available
meaning that it can be installed efficiently.
Anthony DomantiLogan Water | Wastewater pump station
Previous
Next